Wednesday, May 15, 2019

Rough In Plumbing Started

Took a little time out in the construction process to make sure the plumbing would be able to be placed where I wanted it. 

I stubbed the main sewer line out on the passenger side in case I ever need to snake the line.


Got the toilet floor flange installed.


Main sewer line is mounted. Still need to do the shower and sinks tie-ins, then finish out the main line to a gate valve on driver side.


Now, back to building walls...